产品中心
新闻动态 当前位置:首页>新闻动态>新闻动态

调试和运行在完成设备安装后

网址:www.kongyajix.oy56.cn  2022-01-10  作者:admin    阅读:

调试和运行在完成设备安装后,检查电机或皮带转向是否是顺时针,如果反向,则做调整; 检查进线是否正确。这些工作做好之后,对控制板内的各种参数进行检查,有的参数设置可以调整,输入厂家制定的密码进行修改。螺杆空压机试车的主要参数内容包括;额定压力上限、额定压力下限、风机启动温度、风机停机温度、主机启动时间、风机启动时间、兴角延时时间、加载延时时间、河北立体车库 消防报警器塑料配件 电缆接地箱 电缆保护接地箱 塑料土工格栅 消弧线圈装置 空载延时时间、停机延时时间、启动延时时间、备用延时时间、排水开延时间、排水关延时间、启动方式、加载方式、通讯方式、油过滤器复位、油精分器复位、气过滤器复位、润滑油复位、润滑脂复位、油过滤器最大使用时间、油精分最大使用时间、气过滤最大使用时间、主机额定电流、风机额定电流、排气预。带温度、承载温度、保护温度、排气报粉温度、供气停机压力、卸载压力高限、电流不平衡度、断相保护时间、过载重启延时等等。
After debugging and operation, check whether the motor or belt steering is clockwise or not, and adjust if it is in the reverse direction; Check whether the incoming line is correct. After these works are done, check the various parameters in the control board, some parameter settings can be adjusted, and input the password made by the manufacturer to modify. The main parameters of screw air compressor test run include:; Upper limit of rated pressure, lower limit of rated pressure, starting temperature of fan, stopping temperature of fan, starting time of main engine, starting time of fan, Xingjiao delay time, loading delay time, no-load delay time, stopping delay time, starting delay time, standby delay time, drainage opening delay time, drainage closing delay time, starting mode, loading mode, communication mode Oil filter reset, oil purifier reset, air filter reset, lubricating oil reset, grease reset, maximum service time of oil filter, maximum service time of oil purifier, maximum service time of air filter, rated current of main engine, rated current of fan, exhaust pre-set. With temperature, bearing temperature, protection temperature, exhaust powder temperature, gas supply shutdown pressure, unloading pressure high limit, current imbalance, open phase protection time, overload restart delay and so on.
另外,在开机前还要将管道铺设准备好,检查管道系统的阀门开启状态,放空阀要关闭。一些有后处理装置的空压机,有时还需要后处理厂家到现场操作。检查无误之后,便可试运行设备。
In addition, before starting up, the pipeline should be laid well, the valve opening state of the pipeline system should be checked, and the vent valve should be closed. Some air compressors with post-treatment devices sometimes need post-treatment manufacturers to operate on site. After checking, the equipment can be put into trial operation.

返回新闻

网站出租电话
13313028229